The city thatpowers itself.

DHA Energy Supply Company is Pakistan’s first private distribution and supplier-of-last-resort licensee — building, owning and operating the network that lights DHA City Karachi. Licensed by NEPRA, energising from 1 October 2026.

NEPRA licensed · 2026–2046Distribution + SoLRSolar supply approved
Fig. 01 · Energy corridor
Fig. 01 · Energy corridor — wind & solar generation transmitted to DHA CityDrag to orbit
DESCO — service territory dataDS-01Rev ASheet 01 of 07
01Licence term0 years1 Oct 2026 — 30 Sep 2046, under NEPRA
02Service territory0 acresDHA City Karachi, District Malir
03Initial procurement0 MWPower Acquisition Contract · Lucky Cement Ltd
04Distance from Karachi0 kmOn the M-9 Motorway

First private entity in Pakistan licensed for both electricity distribution and supply of last resort.

02 · About DESCO

A utility built for one city

DHA Energy Supply Company (Private) Limited is a subsidiary of DHA City Karachi, established to secure an independent and reliable supply of electricity for the city’s residents, businesses and institutions. With no conventional distribution network reaching the site, the company pursued its own licences from 2017 onward.

In July 2026, NEPRA granted DESCO parallel Distribution and Supplier-of-Last-Resort licences — the first such grant to a privately owned entity under Pakistan’s Competitive Trading Bilateral Contract Market framework — together with approval to supply solar-generated power. The regulator found the company’s financial and technical capability sufficient, with grid stations, transmission lines and a distribution network already established in DHA City.

Company register
Registered nameDHA Energy Supply Company (Pvt) LtdParentDHA City KarachiRegulatorNEPRALicencesDistribution · SoLR · Solar supplyTerritoryDHACK, District MalirStatusEnergising 01 Oct 2026
03 · The mandate

Distribution

DESCO develops and operates its own distribution network inside DHA City — grid stations, transmission lines and a modern distribution system, built where no national-grid or K-Electric infrastructure reaches.

Supplier of last resort

Under its SoLR licence, DESCO is bound to deliver uninterrupted electricity to every eligible consumer in its territory, without discrimination — and to step in if any competitive supplier fails.

Solar supply

Beside K-Electric, the first company in Pakistan to hold both electricity distribution and solar power supply approvals — clearing the way for solar and other approved sources to feed the city’s network.

04 · The territory — Karachi to DHACK
GATEWAYCBDLUCKY CEMENT6 MW POWER ACQUISITIONDHA CITY KARACHI22,000+ ACRES · DISTRICT MALIRGRID STATION · 2027M-9 MOTORWAYTO HYDERABAD →KARACHIARABIAN SEA≈ 30 KM ON THE M-9DWG 04 · SERVICE TERRITORYNEPRA LICENCE 2026–2046 · DHA CITY TO SCALEN0 — 2 KM

DHA City Karachi sits roughly 56 km up the M-9 Motorway from Karachi. Lucky Cement’s plant adjoins its north-east corner across the motorway, and its 6 MW feeds straight into DESCO’s grid station. With no link to the national grid or the K-Electric network, the territory is served from within.

05 · Solar & the energy mix
Supply programme — statusAs of Q3 2026
Lucky Cement PAC6 MW · operating
Grid stationConstruction 2027
NEPRA LicenceLicensed Jul 2025

DESCO is the first company in Pakistan licensed to supply solar-generated power alongside conventional distribution. Bars indicate programme stage, not installed capacity.

06 · The programme — 2017 to 2046
2017

Licensing process opens with NEPRA.

Jul 2026

Dual distribution + SoLR licences granted; solar supply approved — a first in Pakistan.

Oct 2026

DESCO takes over supply from K-Electric on 1 October.

2027

Grid station construction begins; feasibility study complete.

2030–31

DHA Indus Hills Phase 1 (≈4,600 acres) completes.

2046

Licence horizon: 30 September 2046.

“The licence was not merely one of several options, but the most viable and practical arrangement after careful assessment of ground realities.”
— Engr. Maqsood Anwar Khan, Member (Development), NEPRA
07 · The connection desk

Supply notices, in writing

Connection schedules, tariff determinations and energisation notices for residents and allottees of DHA City Karachi, issued to subscribers as they are published.

Write to us at desco@dhacitykarachi.org.pk